Link spanning Pearl River Delta from Shenzhen to Zhongshan approved
Bridge and tunnel spanning 55km will cut travel time from Shenzhen to Zhongshan on western side of river to less than 30 minutes

Guangdong authorities have finally approved a 55-kilometre bridge-and-tunnel project to provide Shenzhen a direct route to the western side of the Pearl River Delta.
The provincial Transport Department has released its plan for the link between Shenzhen and Zhongshan , which would reduce travel times to less than 30 minutes in clear traffic, down from about 90 minutes.
The overloaded Humen Bridge is the only span connecting both sides of the delta. The new project could turn Zhongshan into a destination for Shenzhen companies looking for cheap and abundant land and boost Shenzhen's efforts to eclipse Hong Kong's port.
Shenzhen authorities first proposed building a bridge or tunnel to Zhongshan in 2008, soon after its request to be included in the Hong Kong-Zhuhai-Macau bridge project was rejected by Beijing due to strong opposition from Hong Kong.
But Shenzhen struggled to get political backing from the provincial or central governments as both wanted to give priority to the more southerly crossing.
The Transport Department said on Friday the new project would consist of a 6.7-kilometre tunnel starting on the Shenzhen side and 19 bridges totalling 43 kilometers. Construction is scheduled to begin in 2015 and be completed in 2021, the government-run Shenzhen Special Zone Daily reported